{"id":80983,"date":"2024-10-17T18:50:03","date_gmt":"2024-10-17T18:50:03","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1246-2003\/"},"modified":"2024-10-24T19:45:20","modified_gmt":"2024-10-24T19:45:20","slug":"ieee-1246-2003","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1246-2003\/","title":{"rendered":"IEEE 1246 2003"},"content":{"rendered":"
Revision Standard – Inactive – Superseded. The design, performance, use, testing, and installation of temporary protectivegrounding systems, including the connection points, as used in permanent and mobile substations,are covered in this guide.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | IEEE Guide for Temporary Protective Grounding Systems Used in Substations <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1. Overview 1.1 Scope 1.2 Purpose 2. References <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4. Considerations for temporary protective grounding systems 4.1 General TPG 4.2 Permanent or mobile substation 4.3 Current magnitude and duration <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.4 Special areas of concern <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.5 TPG cable assemblies <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.6 TPG cable <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.7 Clamps <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 4.8 Multiple assemblies <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.9 Attachment points <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.10 Cable extensions 5. Application 5.1 General <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.2 Location of TPGs <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.3 Ratings and selections <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.4 Methods 6. Installation and removal 6.1 General procedures <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 6.2 Tools 6.3 Testing for voltage <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.4 Placing and removing of TPGs <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6.5 Equipment grounding <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 7. Static, capacitive coupled, and electromagnetically coupled voltage protection 7.1 Protective garments 7.2 Attachments 8. Testing 8.1 New TPG component and assembly testing <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 8.2 In-service inspection, maintenance, and testing of TPGs <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Annex A\u2014Terminology A.1 Voltages and currents at the worksite <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | A.2 Safety criteria <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Annex B\u2014Bibliography For further reading <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Temporary Protective Grounding Systems Used in Substations<\/b><\/p>\n |