{"id":446650,"date":"2024-10-20T08:47:49","date_gmt":"2024-10-20T08:47:49","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-flex-350-v1-02023-10\/"},"modified":"2024-10-26T16:23:31","modified_gmt":"2024-10-26T16:23:31","slug":"bsi-flex-350-v1-02023-10","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-flex-350-v1-02023-10\/","title":{"rendered":"BSI Flex 350 v1.0:2023-10"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nContents <\/td>\n<\/tr>\n
4<\/td>\nForeword <\/td>\n<\/tr>\n
6<\/td>\n0 Introduction <\/td>\n<\/tr>\n
7<\/td>\n1 Scope <\/td>\n<\/tr>\n
8<\/td>\n2 Normative references
Standards publications <\/td>\n<\/tr>\n
9<\/td>\nOther publications <\/td>\n<\/tr>\n
10<\/td>\n3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
3.2 Abbreviated terms <\/td>\n<\/tr>\n
11<\/td>\n4 Alternative binder systems
4.1 Main constituents
4.2 Performance assessment <\/td>\n<\/tr>\n
13<\/td>\n5 ABS concrete materials
5.1 Aggregates
5.2 Water
5.3 Admixtures
5.4 Other constituents <\/td>\n<\/tr>\n
14<\/td>\n6 ABS concrete properties
6.1 General <\/td>\n<\/tr>\n
15<\/td>\n6.2 Consistence <\/td>\n<\/tr>\n
16<\/td>\n6.3 Setting time
6.4 Heat of reaction
6.5 Coefficient of thermal expansion
6.6 Compressive strength class <\/td>\n<\/tr>\n
17<\/td>\n6.7 Tensile strength
6.8 Secant modulus of elasticity
6.9 Shrinkage <\/td>\n<\/tr>\n
18<\/td>\n6.10 Creep <\/td>\n<\/tr>\n
19<\/td>\n6.11 Fire resistance <\/td>\n<\/tr>\n
20<\/td>\n7 Durability of ABS concrete
7.1 General <\/td>\n<\/tr>\n
21<\/td>\n7.2 Corrosion induced by carbonation (XC1, XC2, XC3, XC4)
7.3 Corrosion induced by chloride (XS1, XS2, XS3, XD1, XD2, XD3)
7.4 Freeze\/thaw attack with or without de-icing agents (XF1, XF2, XF3, XF4) <\/td>\n<\/tr>\n
22<\/td>\n7.5 Chemical attack [Aggressive Chemical Environment for Concrete Classification (ACEC) exposure class]
7.6 Abrasion (XM1, XM2, XM3) <\/td>\n<\/tr>\n
23<\/td>\nAnnex A (normative)
\nSupply of ABS concrete
A.1 General
A.2 Plant and equipment
A.3 Batching <\/td>\n<\/tr>\n
24<\/td>\nA.4 Placing and finishing
A.5 Early protection and curing <\/td>\n<\/tr>\n
25<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Alternative binder systems for lower carbon concrete. Code of Practice<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2023<\/td>\n28<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":446659,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1258,2641],"product_tag":[],"class_list":{"0":"post-446650","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-100-30","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/446650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/446659"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=446650"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=446650"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=446650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}