{"id":416372,"date":"2024-10-20T06:10:23","date_gmt":"2024-10-20T06:10:23","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-22-30456299-dc-2022\/"},"modified":"2024-10-26T11:28:05","modified_gmt":"2024-10-26T11:28:05","slug":"bsi-22-30456299-dc-2022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-22-30456299-dc-2022\/","title":{"rendered":"BSI 22\/30456299 DC 2022"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
6<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references <\/td>\n<\/tr>\n
10<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
12<\/td>\n4 Abbreviated terms
5 Requirements and recommendations
5.1 Overview
5.1.1 General
5.1.2 Phases of the BACS project <\/td>\n<\/tr>\n
13<\/td>\n5.1.3 Documentation
5.1.4 Training
5.1.5 Reviewing and improving building performance <\/td>\n<\/tr>\n
14<\/td>\n5.1.6 Graphical overview <\/td>\n<\/tr>\n
15<\/td>\n5.2 Design phase
5.2.1 General
5.2.2 Determination of project requirements <\/td>\n<\/tr>\n
19<\/td>\n5.2.3 Project planning and organization <\/td>\n<\/tr>\n
20<\/td>\n5.2.4 Design documents and technical specification <\/td>\n<\/tr>\n
21<\/td>\n5.2.5 Contract
5.3 Engineering phase
5.3.1 General
5.3.2 Project planning and coordination details <\/td>\n<\/tr>\n
22<\/td>\n5.3.3 Detailed hardware and function design
5.3.4 Approval of design submittals <\/td>\n<\/tr>\n
23<\/td>\n5.3.5 Hardware configuration
5.3.6 Control strategy configuration
5.3.7 Management and operator function configuration <\/td>\n<\/tr>\n
24<\/td>\n5.3.8 System test
5.4 Installation phase
5.4.1 General
5.4.2 Installing <\/td>\n<\/tr>\n
25<\/td>\n5.4.3 BACS commissioning <\/td>\n<\/tr>\n
27<\/td>\n5.5 Completion phase
5.5.1 General
5.5.2 System demonstration <\/td>\n<\/tr>\n
28<\/td>\n5.5.3 Operator training
5.5.4 Handover
5.5.5 Acceptance
5.5.6 Finalization <\/td>\n<\/tr>\n
29<\/td>\n5.5.7 Completion decision
5.6 Documentation
5.6.1 General
5.6.2 User documents
5.6.3 Datasheets
5.6.4 Operation and maintenance documents <\/td>\n<\/tr>\n
30<\/td>\n5.7 Training
6 Review and improvement of building performance <\/td>\n<\/tr>\n
31<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

BS EN ISO 16484-1. Building automation and control systems (BACS) – Part 1. Project specification and implementation<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2022<\/td>\n31<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":416383,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[707,2641],"product_tag":[],"class_list":{"0":"post-416372","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-35-240-99","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/416372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/416383"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=416372"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=416372"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=416372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}