{"id":416372,"date":"2024-10-20T06:10:23","date_gmt":"2024-10-20T06:10:23","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-22-30456299-dc-2022\/"},"modified":"2024-10-26T11:28:05","modified_gmt":"2024-10-26T11:28:05","slug":"bsi-22-30456299-dc-2022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-22-30456299-dc-2022\/","title":{"rendered":"BSI 22\/30456299 DC 2022"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4 Abbreviated terms 5 Requirements and recommendations 5.1 Overview 5.1.1 General 5.1.2 Phases of the BACS project <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.1.3 Documentation 5.1.4 Training 5.1.5 Reviewing and improving building performance <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.1.6 Graphical overview <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.2 Design phase 5.2.1 General 5.2.2 Determination of project requirements <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.2.3 Project planning and organization <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.2.4 Design documents and technical specification <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.2.5 Contract 5.3 Engineering phase 5.3.1 General 5.3.2 Project planning and coordination details <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.3.3 Detailed hardware and function design 5.3.4 Approval of design submittals <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.3.5 Hardware configuration 5.3.6 Control strategy configuration 5.3.7 Management and operator function configuration <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.3.8 System test 5.4 Installation phase 5.4.1 General 5.4.2 Installing <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.4.3 BACS commissioning <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.5 Completion phase 5.5.1 General 5.5.2 System demonstration <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.5.3 Operator training 5.5.4 Handover 5.5.5 Acceptance 5.5.6 Finalization <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.5.7 Completion decision 5.6 Documentation 5.6.1 General 5.6.2 User documents 5.6.3 Datasheets 5.6.4 Operation and maintenance documents <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5.7 Training 6 Review and improvement of building performance <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS EN ISO 16484-1. Building automation and control systems (BACS) – Part 1. Project specification and implementation<\/b><\/p>\n |