{"id":396683,"date":"2024-10-20T04:25:52","date_gmt":"2024-10-20T04:25:52","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c37-71-2001\/"},"modified":"2024-10-26T08:13:23","modified_gmt":"2024-10-26T08:13:23","slug":"ieee-c37-71-2001","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c37-71-2001\/","title":{"rendered":"IEEE C37.71-2001"},"content":{"rendered":"
Revision Standard – Superseded. Requirements are given for three-phase group operated subsurface and vault load-interrupting switchgear with maximum ratings of 600 A and 38 kV, and for utilizing separable insulated connectors. Definitions are given, and service conditions and ratings are discussed.Design tests, production tests, and construction requirements are included.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1. Scope 2. References <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 3. Definitions 4. Service conditions 4.1 Usual service conditions <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 4.2 Unusual service conditions 5. Ratings and test requirements 5.1 Rating information 5.2 Voltage ratings and related test requirements 5.3 Current test values <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 6. Design tests 6.1 General <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.2 Interrupting current tests <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.3 Short-time current tests <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.4 Insulation (dielectric) tests <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.5 Continuous current test <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.6 Mechanical operation test <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.7 Partial discharge (corona) level test 6.8 DC withstand test 6.9 Pressure tests 7. Production tests <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7.1 Circuit resistance test 7.2 Sixty hertz withstand test 7.3 Leak test 7.4 Operating assurance tests 7.5 Partial discharge (corona) level tests 7.5 Partial discharge (corona) level tests 8. Conformance tests <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8.1 Temperature measurements 8.2 Impulse withstand tests 8.3 Loop current requirement <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 9. Construction requirements 9.1 Grounding provision 9.2 Manual operating provisions 9.3 Position indicators 9.4 Insulating-medium quantity indicators <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 9.5 Drain and replacement provisions 9.6 Sampling and addition provisions 9.7 Tank construction 9.8 Terminations 9.9 Bushing designation <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 9.10 Nameplate 9.11 User identification plate <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 10. Shipping requirements <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard for Three-Phase Manually Operated Subsurface and Vault Load-Interrupting Switches for Alternating-Current Systems<\/b><\/p>\n |