{"id":216613,"date":"2024-10-19T14:03:01","date_gmt":"2024-10-19T14:03:01","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-56072017-tc\/"},"modified":"2024-10-25T07:07:12","modified_gmt":"2024-10-25T07:07:12","slug":"bs-56072017-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-56072017-tc\/","title":{"rendered":"BS 5607:2017 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
124<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | Section 1: Preliminary processes 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
128<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | 4 Preliminary procedures 4.1 General 4.2 Legal framework 5 Role of the client <\/td>\n<\/tr>\n | ||||||
134<\/td>\n | 5.1 General 5.2 Demolition works <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | 6 Risk assessment and site survey 6.1 Risk assessment <\/td>\n<\/tr>\n | ||||||
137<\/td>\n | 6.2 Site survey <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | 6.3 Hazards from electrical sources 6.4 Exclusion zone and warning procedures 6.5 Sources of ignition and fire 6.6 Advance notices and consultation <\/td>\n<\/tr>\n | ||||||
139<\/td>\n | 7 Method statement 7.1 General 7.2 Preparation <\/td>\n<\/tr>\n | ||||||
140<\/td>\n | 7.3 Implementation of the method statement <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | 7.4 Exclusion zone and warning procedures\/systems <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | 8 Supervision and responsibility <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | 9 Safety and security of explosives during acquisition, transport and storage on site 9.1 General 9.2 Planning <\/td>\n<\/tr>\n | ||||||
145<\/td>\n | 9.3 Storage <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | 9.4 Transport of explosives on site <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | 9.5 Transport of explosives by air 9.6 Disposal of unwanted explosives or explosives which have deteriorated during storage <\/td>\n<\/tr>\n | ||||||
150<\/td>\n | 10 Safety when using explosives 10.1 General 10.2 Handling and charging of explosives <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | 10.3 Types of explosives <\/td>\n<\/tr>\n | ||||||
153<\/td>\n | 10.4 Initiation systems <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | 10.5 Misfires <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | Figure 1 \u2014 Procedure to remedy misfires <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | Section 2: Blasting operations 11 Tunnelling and shaft sinking 11.1 General 11.2 Method statement 11.3 Site survey <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | 11.4 Containment measures 11.5 Explosives <\/td>\n<\/tr>\n | ||||||
164<\/td>\n | Figure 2 \u2014 Exclusion zones for shaft sinking and tunnelling <\/td>\n<\/tr>\n | ||||||
166<\/td>\n | 11.6 Safety and operations <\/td>\n<\/tr>\n | ||||||
172<\/td>\n | 12 Demolition <\/td>\n<\/tr>\n | ||||||
173<\/td>\n | 12.1 General 12.2 Quality assurance and auditing of the works 12.3 Pre-weakening 12.4 Site survey\/risk assessment <\/td>\n<\/tr>\n | ||||||
174<\/td>\n | 12.5 Blast design <\/td>\n<\/tr>\n | ||||||
175<\/td>\n | 12.6 Independent audit of the blasting method statement and its implementation 12.7 Method statement <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | 12.8 Explosives <\/td>\n<\/tr>\n | ||||||
180<\/td>\n | 12.9 Safety and operations <\/td>\n<\/tr>\n | ||||||
181<\/td>\n | 12.10 Misfires 12.11 Debris and site clearance 13 Underwater blasting <\/td>\n<\/tr>\n | ||||||
182<\/td>\n | 13.1 General 13.2 Method statement 13.3 Site survey <\/td>\n<\/tr>\n | ||||||
183<\/td>\n | 13.4 Exclusion zones and blast warning procedures Figure 3 \u2014 Relationship of blast area and exclusion zones in underwater blasting Table 1 \u2014 Recommended minimum distances from underwater blasting operations <\/td>\n<\/tr>\n | ||||||
184<\/td>\n | 13.5 Explosives <\/td>\n<\/tr>\n | ||||||
186<\/td>\n | 13.6 Safety and operations <\/td>\n<\/tr>\n | ||||||
188<\/td>\n | 13.7 Misfires 13.8 Seismic impulse generation 14 Land excavation 14.1 General <\/td>\n<\/tr>\n | ||||||
189<\/td>\n | 14.2 Documentation 14.3 Risk assessment and site survey <\/td>\n<\/tr>\n | ||||||
190<\/td>\n | 14.4 Method statements <\/td>\n<\/tr>\n | ||||||
191<\/td>\n | 14.5 Drilling 14.6 Exclusion zones and blast protection <\/td>\n<\/tr>\n | ||||||
192<\/td>\n | Figure 4 \u2014 Exclusion zone for land excavation <\/td>\n<\/tr>\n | ||||||
193<\/td>\n | 14.7 Transport and storage 14.8 Explosives and initiation systems Table 2 \u2014 Selection and use of explosives <\/td>\n<\/tr>\n | ||||||
194<\/td>\n | Table 3 \u2014 Selection and use of initiation systems 14.9 Safety and operations <\/td>\n<\/tr>\n | ||||||
195<\/td>\n | 15 Other forms of blasting 15.1 Mini-blasting <\/td>\n<\/tr>\n | ||||||
196<\/td>\n | 15.2 Deflagrating compounds (low-velocity explosives) 15.3 Cardox 15.4 Expanding grouts <\/td>\n<\/tr>\n | ||||||
197<\/td>\n | Annex A (normative)\u2002 Competence for blasting operations <\/td>\n<\/tr>\n | ||||||
198<\/td>\n | Annex B (informative)\u2002 Qualifications for blasting <\/td>\n<\/tr>\n | ||||||
199<\/td>\n | Table B.1 \u2014 Blasting operations competency units Annex C (informative)\u2002 Explosives engineering training <\/td>\n<\/tr>\n | ||||||
200<\/td>\n | Annex D (informative)\u2002 General properties of explosives <\/td>\n<\/tr>\n | ||||||
201<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Code of practice for the safe use of explosives in the construction industry<\/b><\/p>\n |