{"id":216580,"date":"2024-10-19T14:02:53","date_gmt":"2024-10-19T14:02:53","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-19-30400095-dc\/"},"modified":"2024-10-25T07:07:02","modified_gmt":"2024-10-25T07:07:02","slug":"bsi-19-30400095-dc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-19-30400095-dc\/","title":{"rendered":"BSI 19\/30400095 DC"},"content":{"rendered":"

This document specifies the essential requirements of stationary systems for production of brines for winter road maintenance and includes tests of these requirements. Installation boundary: chloride and water inlet to the saturator, brine outlet to the spreading machine. Within the scope are brine storage and brine loading\/unloading equipment also.<\/p>\n

The following points are not covered by this document:<\/p>\n