BS EN 61850-4:2011
$167.15
Communication networks and systems for power utility automation – System and project management
Published By | Publication Date | Number of Pages |
BSI | 2011 | 40 |
IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid.
PDF Catalog
PDF Pages | PDF Title |
---|---|
6 | English CONTENTS |
8 | 1 Scope 2 Normative references |
9 | 3 Terms and definitions |
12 | 4 Abbreviations |
13 | 5 Engineering requirements 5.1 Overview Figures Figure 1 – Structure of the UAS and its environment |
14 | 5.2 Categories and types of parameters |
15 | Figure 2 – Structure of UAS and IED parameters |
17 | 5.3 Engineering tools |
21 | 5.4 Flexibility and expandability |
22 | 5.5 Scalability 5.6 Automatic project documentation |
23 | Figure 5 – Project related documentation of UAS |
25 | 5.7 Standard documentation |
26 | 5.8 System integrator’s support 6 System life cycle 6.1 Requirements of product versions |
27 | Figure 6 – Two meanings of the system life cycle |
28 | 6.2 Announcement of product discontinuation 6.3 Support after discontinuation |
29 | 7 Quality assurance 7.1 Division of responsibility Figure 7 – Stages of quality assurance – Responsibility of manufacturerand system integrator |
31 | 7.2 Test equipment |
32 | 7.3 Classification of quality tests Figure 8 – Contents of system test |
33 | Figure 9 – Contents of type test |
34 | Figure 10 – Contents of routine test |
35 | Figure 11 – Testing stages for site acceptance test |
36 | Annex A (informative) Announcement of discontinuation (example) Figure A.1 – Announcement conditions |
37 | Annex B (informative) Delivery obligations after discontinuation (example) Figure B.1 – Periods for delivery obligations |
38 | Bibliography |