BS EN 61850-4:2011

$167.15

Communication networks and systems for power utility automation – System and project management

Published By Publication Date Number of Pages
BSI 2011 40
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid.

PDF Catalog

PDF Pages PDF Title
6 English

CONTENTS
8 1 Scope
2 Normative references
9 3 Terms and definitions
12 4 Abbreviations
13 5 Engineering requirements
5.1 Overview
Figures

Figure 1 – Structure of the UAS and its environment
14 5.2 Categories and types of parameters
15 Figure 2 – Structure of UAS and IED parameters
17 5.3 Engineering tools
21 5.4 Flexibility and expandability
22 5.5 Scalability
5.6 Automatic project documentation
23 Figure 5 – Project related documentation of UAS
25 5.7 Standard documentation
26 5.8 System integrator’s support
6 System life cycle
6.1 Requirements of product versions
27 Figure 6 – Two meanings of the system life cycle
28 6.2 Announcement of product discontinuation
6.3 Support after discontinuation
29 7 Quality assurance
7.1 Division of responsibility
Figure 7 – Stages of quality assurance – Responsibility of manufacturerand system integrator
31 7.2 Test equipment
32 7.3 Classification of quality tests
Figure 8 – Contents of system test
33 Figure 9 – Contents of type test
34 Figure 10 – Contents of routine test
35 Figure 11 – Testing stages for site acceptance test
36 Annex A (informative)
Announcement of discontinuation (example)
Figure A.1 – Announcement conditions
37 Annex B (informative)
Delivery obligations after discontinuation (example)
Figure B.1 – Periods for delivery obligations
38 Bibliography