{"id":89875,"date":"2024-10-18T07:16:49","date_gmt":"2024-10-18T07:16:49","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ms-state-5-n-a\/"},"modified":"2024-10-24T20:24:55","modified_gmt":"2024-10-24T20:24:55","slug":"ms-state-5-n-a","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ms\/ms-state-5-n-a\/","title":{"rendered":"MS State 5 N\/A"},"content":{"rendered":"

None<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\n0 1 Cover to Manual 062011 <\/td>\n<\/tr>\n
2<\/td>\n0 2 Title Page 062011 <\/td>\n<\/tr>\n
3<\/td>\n0 3 Table of Contents 2011 <\/td>\n<\/tr>\n
12<\/td>\n1 1 Section 100 divider <\/td>\n<\/tr>\n
13<\/td>\n1 2 Section 100 contents <\/td>\n<\/tr>\n
14<\/td>\n1 3 Section 100
BOB MANUAL
Sixth Edition \u2013 June 2011
BOB MANUAL (part of DFA Manual per SoS September 2010 Procedure)100.4 <\/td>\n<\/tr>\n
22<\/td>\n2 1 Section 200 divider <\/td>\n<\/tr>\n
23<\/td>\n2 2 Section 200 contents <\/td>\n<\/tr>\n
24<\/td>\n2 3 Section 200
Classification of Needs <\/td>\n<\/tr>\n
29<\/td>\nAppropriation Bills <\/td>\n<\/tr>\n
32<\/td>\n3 1 Section 300 divider <\/td>\n<\/tr>\n
33<\/td>\n3 2 Section 300 contents <\/td>\n<\/tr>\n
34<\/td>\n3 3 Section 300
MISSISSIPPI STATE UNIVERSITY <\/td>\n<\/tr>\n
35<\/td>\nProject Information <\/td>\n<\/tr>\n
36<\/td>\nINSTITUTION\/AGENCY\/DEPARTMENT MASTER CODE <\/td>\n<\/tr>\n
44<\/td>\n4 1 Section 400 divider <\/td>\n<\/tr>\n
45<\/td>\n4 2 Section 400 contents
Section Description Page <\/td>\n<\/tr>\n
46<\/td>\n4 3 Section 400
PERMITS & LOCAL AUTHORITIES <\/td>\n<\/tr>\n
47<\/td>\nRoof Policy Elements <\/td>\n<\/tr>\n
51<\/td>\nACM Guidelines <\/td>\n<\/tr>\n
62<\/td>\nBOB Bureau of Building, Grounds and Real Property
Management
UA Using Agency
ITS Information Technology Service
SAF Standard Approval Form – Bureau of Building,
Grounds and Real Property Management
PPRB Public Procurement Review Board
GS General Services
UINFORMATION TECHNOLOGY SERVICE (ITS) <\/td>\n<\/tr>\n
63<\/td>\nUBOB COMMUNICATIONS PROJECT INITIATION – STANDARD APPROVAL FORM (SAF)
GS# 100-101 Communications\/New Building
UOPTION 1: ITS INVOLVEMENT IN THE PROJECT
This option requires a UCP-28 ITS Procurement Request FormU to be prepared, executed and submitted\/transmitted to ITS by the BOB.
UScope-of-Work:U Detail project requirements, special equipment, fixture
UScheduleU: Communications contract time frame – when will completed building be put into use and systems required to operate.
UUA Contact PersonU: The person at the UA who is responsible for making
UFundsU: Indicate source of funds – bond fund, outside funds and\/or other funds available, which will establish a beginning budget. <\/td>\n<\/tr>\n
64<\/td>\nPre-Design Conference
Scheduled Schematic Document Reviews, Design Development Document Reviews and Contract Document Reviews
Pre-Bid Conference
Pre-Construction Conference
Monthly Construction Progress Meetings
Construction Schedules
Monthly Applications for Payment.
Letter – UA to BOB outlining scope-of-work, budget, schedule and contact person.
Preparation of CP-28 by BOB. Copy to UA and Project Professionals.
UScope and Budget OutlineU – ITS to BOB for BOB and UA approval. Copy of approved to Project Professionals. <\/td>\n<\/tr>\n
65<\/td>\nCP-1 from ITS to BOB-coordination with Building Professional accomplished. Copy to UA and Project Professional.
PPRB approval of CP-1. Copy to UA, Project Professional and ITS.
UNotice to ProceedU to Communications Contractor issued by ITS. Estimated contract time and billing procedures\/route included. Copy to BOB, UA and Project Professional.
Review of project budget by BOB. Approval required. Copy of approval to ITS, UA and Project Professionals.
Design and construction of communications project by ITS. Communications contract coordinated with ITS and UA and with Building Professional as
required. Building Contractor coordination with Building Professional, BOB, UA and ITS as required.
Payment of fees to ITS by BOB from project funds at the BOB – may be bond funds or outside funds deposited by the UA at the BOB.
Payment for construction to Communications Contractor by BOB after approved by ITS. May be bond funds or outside funds deposited by the UA at the BOB.
Any Change Orders approved by BOB and UA prior to any work at project site. Acceptance to communications project by BOB as recommended by ITS.
Acceptance of total project as recommended by project Building Professional.
Pre-established UexemptionsU are outlined in Chapters 5, 6, and 7, UITS Procurement HandbookU including:
State Agencies: Exempt for proposed installations including acquisitions of equipment, materials and labor from $0 to $10,000 in value.
IHL-Institutions of Higher Learning: Exempt for proposed installations including acquisitions of equipment, materials and labor from $0 to $50,000 in value.
Community Colleges: Exempt for proposed installations including acquisitions of equipment, materials and labor from $0 to $50,000 in value.
This option requires an approved UCP-5 Request for ExemptionU. The CP-5 is prepared by the UA and forwarded to ITS by the UA. Copies to BOB and project Building Professional. <\/td>\n<\/tr>\n
66<\/td>\nITS approval\/disapproval CP-5. Copy to BOB and project Building Professional by UA.
Directions to project Building Professional by UA\/BOB concerning the scope-of-work to be included in the planning and construction.
Accomplish work authorized by construction contract or separate contracts as approved by BOB and UA. All contracts are approved by PPRB if project funds are used. Work authorized and paid by the UA are separate contracts if no project funds are used.
Acceptance of project by BOB and UA as recommended by project Building Professional.
CP-5: Any fees charged by ITS associated with the CP-5 are the responsibility of the UA. These fees will not be paid with project funds at the BOB.
CP-28\/CP-1: Any fees charged by ITS associated with the CP-28\/CP-1 may be included in the project budget and may be paid from project funds at the BOB or other funds transferred to the BOB by the UA. The required fees are listed by ITS on the UScope …
UCHANGES
CP-28 w\/ UA Request Letter attached
ITS Scope and Budget Outline
CP-1
CP-5
PPRB Notice to ITS – Contract Award
ITS Notice to Proceed
ITS Change Order <\/td>\n<\/tr>\n
69<\/td>\nSample <\/td>\n<\/tr>\n
74<\/td>\n5 1 Section 500 divider <\/td>\n<\/tr>\n
75<\/td>\n5 2 Section 500 contents <\/td>\n<\/tr>\n
76<\/td>\n5 3 Section 500 <\/td>\n<\/tr>\n
86<\/td>\n6 1 Section 600 divider <\/td>\n<\/tr>\n
87<\/td>\n6 2 Section 600 contents <\/td>\n<\/tr>\n
89<\/td>\n6 3 Section 600
PLANNING PHASES
Planning Phases
Consultant Services
SCHEDULE\/TIME <\/td>\n<\/tr>\n
90<\/td>\nPROGRAM PHASE <\/td>\n<\/tr>\n
93<\/td>\nSite Analysis <\/td>\n<\/tr>\n
94<\/td>\nConceptual Drawings <\/td>\n<\/tr>\n
101<\/td>\nALLOWANCES <\/td>\n<\/tr>\n
103<\/td>\nSIGNAGE
CONSTRUCTION DOCUMENT APPROVAL <\/td>\n<\/tr>\n
104<\/td>\nADDENDA <\/td>\n<\/tr>\n
107<\/td>\nMODIFICATIONS TO BID <\/td>\n<\/tr>\n
112<\/td>\n7 1 Section 700 divider <\/td>\n<\/tr>\n
113<\/td>\n7 2 Section 700 contents <\/td>\n<\/tr>\n
115<\/td>\n7 3 Section 700 <\/td>\n<\/tr>\n
117<\/td>\nContract, the Contractor will submit to the <\/td>\n<\/tr>\n
119<\/td>\nCONTRACTOR’S DUTIES & RESPONSIBILITIES <\/td>\n<\/tr>\n
121<\/td>\nEQUAL OPPORTUNITY EMPLOYER <\/td>\n<\/tr>\n
124<\/td>\nCHANGE ORDERS <\/td>\n<\/tr>\n
133<\/td>\n8 1 Section 800 divider <\/td>\n<\/tr>\n
134<\/td>\n8 2 Section 800 contents <\/td>\n<\/tr>\n
135<\/td>\n8 3 Section 800 <\/td>\n<\/tr>\n
137<\/td>\nSOLE SOURCE ITEMS <\/td>\n<\/tr>\n
138<\/td>\nBID EXEMPTIONS <\/td>\n<\/tr>\n
147<\/td>\n9 1 Division 0 divider <\/td>\n<\/tr>\n
148<\/td>\n9 2 Division 0 contents <\/td>\n<\/tr>\n
149<\/td>\n9 3 Division 0 current 063011 <\/td>\n<\/tr>\n
150<\/td>\nSECTION 00100
PART 1 – GENERAL <\/td>\n<\/tr>\n
151<\/td>\nPART 2 – PROPOSAL FORM <\/td>\n<\/tr>\n
152<\/td>\nPART 3 – SUBMITTING THE PROPOSAL FORM
PART 4 – BID OPENING AND AWARD OF CONTRACT <\/td>\n<\/tr>\n
154<\/td>\nBase Bid
Alternates
Addenda <\/td>\n<\/tr>\n
155<\/td>\nSECTION 00300 <\/td>\n<\/tr>\n
157<\/td>\nTHE OWNER AND THE CONTRACTOR
SECTION 00500 <\/td>\n<\/tr>\n
159<\/td>\nARTICLE 2: CONTRACT SUM
2.2 LIQUIDATED DAMAGES
ARTICLE 3: CONTRACT TIME
ARTICLE 4: PAYMENTS AND FINAL PAYMENTS
ARTICLE 5: MISCELLANEOUS PROVISION <\/td>\n<\/tr>\n
160<\/td>\nSECTION 00600
I. PREAMBLE
II. PERFORMANCE BOND
III. LABOR AND MATERIAL PAYMENT BOND <\/td>\n<\/tr>\n
161<\/td>\nIV. BOND FOR PAYMENT OF TAXES AND OTHER ASSESSMENTS
V. GENERAL CONDITIONS <\/td>\n<\/tr>\n
162<\/td>\nCOMPANIES PROVIDING COVERAGE
A
B
C
D
E
F
G
OR
OR <\/td>\n<\/tr>\n
163<\/td>\nCERTIFICATE OF INSURANCE INSTRUCTIONS
SECTION 00650 <\/td>\n<\/tr>\n
164<\/td>\nSECTION 00700
PART 1 – GENERAL <\/td>\n<\/tr>\n
165<\/td>\nSECTION 00800
PART 1 – GENERAL
GENERAL PROVISIONS
OWNER <\/td>\n<\/tr>\n
166<\/td>\nCONTRACTOR <\/td>\n<\/tr>\n
167<\/td>\nARCHITECT
SUBCONTRACTORS
CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
CHANGES IN THE WORK <\/td>\n<\/tr>\n
168<\/td>\nTIME
PAYMENTS AND COMPLETION <\/td>\n<\/tr>\n
171<\/td>\nPROTECTION OF PERSONS AND PROPERTY
INSURANCE AND BONDS <\/td>\n<\/tr>\n
173<\/td>\nUNCOVERING AND CORRECTION OF WORK
MISCELLANEOUS PROVISIONS <\/td>\n<\/tr>\n
174<\/td>\nTERMINATION OR SUSPENSION OF THE CONTRACT
CLAIMS AND DISPUTES <\/td>\n<\/tr>\n
177<\/td>\nSECTION 00820
PART 1 – EQUAL OPPORTUNITY
PART 2 – DAVIS-BACON ACT REGULATIONS <\/td>\n<\/tr>\n
181<\/td>\nAND TRAINEES TO JOURNEYMEN <\/td>\n<\/tr>\n
183<\/td>\nSECTION 00900 <\/td>\n<\/tr>\n
184<\/td>\n10 1 Division 1 divider <\/td>\n<\/tr>\n
185<\/td>\n10 2 Division 1 contents <\/td>\n<\/tr>\n
186<\/td>\n10 3 Division 1
SUMMARY OF WORK <\/td>\n<\/tr>\n
188<\/td>\nSECTION 01020 <\/td>\n<\/tr>\n
189<\/td>\nSECTION 01027 <\/td>\n<\/tr>\n
190<\/td>\nSECTION 01028 <\/td>\n<\/tr>\n
191<\/td>\nPROJECT COORDINATION
SECTION 01041 <\/td>\n<\/tr>\n
195<\/td>\nNETWORK ANALYSIS SCHEDULE
SECTION 01311 <\/td>\n<\/tr>\n
200<\/td>\nTESTING LABORATORY SERVICES <\/td>\n<\/tr>\n
208<\/td>\nPART 1 – SUMMARY OF WORK SUPPLEMENT
PART 2 – ALLOWANCE SUPPLEMENT <\/td>\n<\/tr>\n
210<\/td>\n11 1 Appendix 100 divider <\/td>\n<\/tr>\n
211<\/td>\n12 1 Appendix 200 divider <\/td>\n<\/tr>\n
212<\/td>\n12 2 Appendix 200 contents
Section Description Page <\/td>\n<\/tr>\n
213<\/td>\n12 3-1 Appendix 200 RR CI PP Memo 2011
DEPARTMENT OF FINANCE AND ADMINISTRATION <\/td>\n<\/tr>\n
214<\/td>\n12 3-2 Appendix 200 Proj Req Data Instruct 2011
(previously Project Data Form prior to 2010) <\/td>\n<\/tr>\n
215<\/td>\n12 3-3 Appendix 200 Proj Req Data Form
PROJECT DATA FORM DATABASE <\/td>\n<\/tr>\n
217<\/td>\n12 3-4 Appendix 200 Impact Memo w instruct 2011
DEPARTMENT OF FINANCE AND ADMINISTRATION <\/td>\n<\/tr>\n
219<\/td>\n12 3-5 Appendix 200 Impact Form
PROJECT DATA FORM DATABASE <\/td>\n<\/tr>\n
221<\/td>\n12 3-6 Appendix 200 Using Agency Declare of Emer
Declaration of Emergency <\/td>\n<\/tr>\n
222<\/td>\n12 3-7 Appendix 200 DFA Cert of Emer
Declaration of Emergency Certificate <\/td>\n<\/tr>\n
223<\/td>\n12 3-8 Appendix 200 Using Agency Transfer Funds <\/td>\n<\/tr>\n
224<\/td>\nDate: _________________________________________________ <\/td>\n<\/tr>\n
225<\/td>\n13 1 Appendix 300 divider <\/td>\n<\/tr>\n
226<\/td>\n14 1 Appendix 400 divider <\/td>\n<\/tr>\n
227<\/td>\n14 2 Appendix 400 contents
Section Description Page <\/td>\n<\/tr>\n
228<\/td>\n14 3 Appendix 400 roof analysis <\/td>\n<\/tr>\n
231<\/td>\n14 4 Appendix 400 roof hist data <\/td>\n<\/tr>\n
232<\/td>\n14 5 Appendix 400 M54 <\/td>\n<\/tr>\n
237<\/td>\n14 10 Appendix 400 M55 <\/td>\n<\/tr>\n
246<\/td>\n14 17 Appendix 400 ProfEvaluationPlan <\/td>\n<\/tr>\n
247<\/td>\n14 18 Appendix 400 ProfEvaluationConst <\/td>\n<\/tr>\n
248<\/td>\n14 19 Appendix 400 blank pages <\/td>\n<\/tr>\n
249<\/td>\n14 21 Appendix 400 Standard Reim Form <\/td>\n<\/tr>\n
250<\/td>\n14 22 Appendix 400 Request for Grant Funds <\/td>\n<\/tr>\n
251<\/td>\n14 23 Appendix 400 Prof Cont Review Form <\/td>\n<\/tr>\n
252<\/td>\n15 1 Appendix 500 divider <\/td>\n<\/tr>\n
253<\/td>\n16 1 Appendix 600 divider <\/td>\n<\/tr>\n
254<\/td>\n16 2 Appendix 600 contents <\/td>\n<\/tr>\n
255<\/td>\n16 3 Appendix 600 Prof App for Pay <\/td>\n<\/tr>\n
256<\/td>\n16 4 Appendix 600 Proj Budject Est <\/td>\n<\/tr>\n
257<\/td>\n16 5 Appendix 600 Bid tab <\/td>\n<\/tr>\n
258<\/td>\n17 1 Appendix 700 divider <\/td>\n<\/tr>\n
259<\/td>\n17 2 Appendix 700 contents <\/td>\n<\/tr>\n
260<\/td>\n17 3 Appendix 700 Precon Agenda <\/td>\n<\/tr>\n
261<\/td>\n17 4 Appendix 700 CO form <\/td>\n<\/tr>\n
263<\/td>\n17 5 Appendix 700 Lease for materials off site
For Materials Stored Off-Site <\/td>\n<\/tr>\n
264<\/td>\n18 1 Appendix 800 divider <\/td>\n<\/tr>\n
265<\/td>\n18 2 Appendix 800 contents <\/td>\n<\/tr>\n
266<\/td>\n18 3 Appendix 800 blank page before page 3 <\/td>\n<\/tr>\n
267<\/td>\n18 4 Appendix 800 Ad-Inst to Bidders-Proposal <\/td>\n<\/tr>\n
268<\/td>\nPART 1 – GENERAL <\/td>\n<\/tr>\n
270<\/td>\nPART 2 – PROPOSAL FORM <\/td>\n<\/tr>\n
271<\/td>\nPART 3 – BID OPENING AND AWARD OF CONTRACT <\/td>\n<\/tr>\n
273<\/td>\nSECTION 00300
To: Department of Finance & Administration
Re: GS #
Project Title
Using Agency
No. Date No. Date
No. Date No. Date
Signature Date
Name and Title
Name of Business
Address
City\/State\/Zip Code ________________________________________________________ <\/td>\n<\/tr>\n
274<\/td>\n18 6 Appendix 800 page 10 – F&E Contract <\/td>\n<\/tr>\n
275<\/td>\n18 7 Appendix 800 FE pay app <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Bureau of Building (BoB) Engineering and Construction Procedure Manual – Sixth Edition, June 2011<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
MS<\/b><\/a><\/td>\nN\/A<\/td>\n275<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":89876,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2789],"product_tag":[],"class_list":{"0":"post-89875","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ms","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/89875","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/89876"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=89875"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=89875"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=89875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}