{"id":464808,"date":"2024-10-20T10:37:02","date_gmt":"2024-10-20T10:37:02","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-501722024\/"},"modified":"2024-10-26T19:34:37","modified_gmt":"2024-10-26T19:34:37","slug":"bs-en-501722024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-501722024\/","title":{"rendered":"BS EN 50172:2024"},"content":{"rendered":"
New edition of EN 50172<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 General 4.1 Normal lighting failures 4.2 Minimum requirements <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.3 Permanently occupied buildings 4.4 Electrical installation 5 Emergency escape lighting system design 5.1 Plan of premises and documentation 5.2 Emergency escape lighting equipment 5.2.1 General <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.2.2 Emergency luminaires 5.2.3 Central safety power supply systems 5.2.4 Automatic test systems 5.3 Identification marking 6 Handover of the emergency escape lighting systems 6.1 Responsibilities <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.2 Handover documentation 7 Maintenance and verification 7.1 General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 7.2 Logbook (Reporting) 7.3 Initial verification <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 7.4 Periodic inspection and testing 7.4.1 General <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7.4.2 Daily inspection 7.4.3 Monthly inspection and testing 7.4.4 Annual verification 7.4.5 Five-year verification <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Annex A (informative)System durations and activation times A.1 System durations A.2 Activation times <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Annex B (informative)On-site luminance and illuminance measurements B.1 Introduction B.2 General B.3 Illuminance and luminance meters <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | B.4 Measurement of emergency lighting illuminance levels B.4.1 General considerations B.4.2 Method A <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | B.4.3 Method B B.4.4 Method C <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | B.4.5 Method D <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | B.5 Illuminance measurements on site B.5.1 General <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | B.5.2 Illuminance measurements of open area (anti panic) lighting, local area lighting and high-risk task area lighting B.5.2.1 Initial verification B.5.2.2 Five-year verification B.5.3 Illuminance measurement of escape route lighting B.5.3.1 General B.5.3.2 Measurements <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | B.5.3.3 Uniformity B.6 Safety signs B.6.1 Internally illuminated safety signs B.6.1.1 Initial verification B.6.1.2 Five-year verification B.6.2 Externally illuminated safety signs B.6.2.1 Initial verification <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | B.6.2.2 Five-year verification B.7 Conformity assessment <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex C (informative)Considerations for emergency lighting systems during and after a premises lockdown or prolonged periods where power is disconnected C.1 Introduction C.2 Disconnection of power C.3 Servicing and testing C.4 Reoccupation <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex D (normative)Wiring system D.1 Introduction D.2 General <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex E (informative)A-deviations <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Emergency escape lighting systems<\/b><\/p>\n |