{"id":373506,"date":"2024-10-20T02:34:25","date_gmt":"2024-10-20T02:34:25","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/awwa-c203-2020\/"},"modified":"2024-10-26T04:31:43","modified_gmt":"2024-10-26T04:31:43","slug":"awwa-c203-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/awwa\/awwa-c203-2020\/","title":{"rendered":"AWWA C203 2020"},"content":{"rendered":"
The purpose of this standard is to provide the requirements for coal-tar protective coatings and linings for steel water pipelines\u2014enamel and tape\u2014hot applied, including materials, application, verification, and delivery. This standard can be referenced in purchase documents for hot-applied coaltar protective coatings and linings of steel water pipelines. The stipulations of this standard apply when this document has been referenced and then only to protective coatings and linings of steel water pipelines with hot-applied coal-tar enamel systems and to hot-applied coal-tar tape on the exterior of special sections, connections, and fittings.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
11<\/td>\n | SECTION 1: GENERAL Sec. 1.1 Scope <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Sec. 1.2 Purpose Sec. 1.3 Application SECTION 2: REFERENCES <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | SECTION 3: DEFINITIONS SECTION 4: REQUIREMENTS Sec. 4.1 Equipment Sec. 4.2 Materials and Workmanship <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Sec. 4.3 Materials for Hot Coal-Tar Enamel Systems <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Sec. 4.4 Application of Hot Coal-Tar Enamel Systems <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Sec. 4.5 Application to Special Connections and Appurtenances, Internal and External <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Sec. 4.6 Materials for Hot Coal-Tar Tape Systems <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Sec. 4.7 Additional Exterior Protection <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Sec. 4.8 Field Procedures SECTION 5: VERIFICATION Sec. 5.1 Materials Inspection and Rejection <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Sec. 5.2 Electrical Inspection <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Sec. 5.3 Thickness Testing Sec. 5.4 Test Procedures <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | SECTION 6: DELIVERY Sec. 6.1 Marking Sec. 6.2 Packaging and Shipping <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Sec. 6.3 Affidavit of Compliance <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" AWWA C203-20 Coal-Tar Protective Coatings and Linings for Steel Water Pipe<\/b><\/p>\n |