{"id":346396,"date":"2024-10-20T00:20:57","date_gmt":"2024-10-20T00:20:57","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-267022007\/"},"modified":"2024-10-25T23:48:06","modified_gmt":"2024-10-25T23:48:06","slug":"bs-iso-iec-267022007","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-267022007\/","title":{"rendered":"BS ISO\/IEC 26702:2007"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
17<\/td>\n | 1. Overview 1.1 Scope <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 1.2 Purpose 1.3 How to use this standard <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 1.4 Organization of this standard 2. Normative references <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 3. Definitions and acronyms 3.1 Definitions <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 3.2 Acronyms 4. General requirements <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 4.1 Systems engineering process 4.2 Policies and procedures for systems engineering <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 4.3 Planning the technical effort <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 4.4 Development strategies 4.5 Modeling and prototyping 4.6 Integrated repository <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 4.7 Integrated data package <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 4.8 Specification tree 4.9 Drawing tree <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 4.10 System breakdown structure 4.11 Integration of the systems engineering effort <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 4.12 Technical reviews 4.13 Quality management 4.14 Product and process improvement <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5. Application of systems engineering throughout the system life cycle <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.1 System definition stage <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 5.2 Preliminary design stage <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 5.3 Detailed design stage <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 5.4 Fabrication, assembly, integration, and test stage <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 5.5 Production and support stages <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 5.6 Simultaneous engineering of life cycle processes <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 6. The systems engineering process 6.1 Requirements analysis <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 6.2 Requirements validation <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 6.3 Functional analysis <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 6.4 Functional verification <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | 6.5 Synthesis <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 6.6 Design verification <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | 6.7 Systems analysis <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 6.8 Control <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | Annex A\u2014The role of systems engineering within an enterprise <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | Annex B\u2014The systems engineering management plan <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Annex C\u2014Use of IEEE Std 1220 in an ISO\/IEC 15288 context <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | Annex D\u2014Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Systems engineering. Application and management of the systems engineering process<\/b><\/p>\n |