{"id":268714,"date":"2024-10-19T17:58:36","date_gmt":"2024-10-19T17:58:36","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-351012017\/"},"modified":"2024-10-25T14:03:05","modified_gmt":"2024-10-25T14:03:05","slug":"bs-iso-351012017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-351012017\/","title":{"rendered":"BS ISO 35101:2017"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nNational foreword <\/td>\n<\/tr>\n
7<\/td>\nForeword <\/td>\n<\/tr>\n
8<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references <\/td>\n<\/tr>\n
10<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
12<\/td>\n4 Abbreviated terms
5 Risk management
5.1 General <\/td>\n<\/tr>\n
13<\/td>\n5.2 Management of working environment risks in the design process
5.3 Mitigating measures \u2014 Risk reduction principles
5.3.1 Hierarchy of controls <\/td>\n<\/tr>\n
14<\/td>\n5.3.2 ALARP
5.4 Special assessment in Arctic environment
5.4.1 Input to design specification <\/td>\n<\/tr>\n
16<\/td>\n5.4.2 Risk assessments in operation \u2014 Operational solutions
6 Management of working environment hazards in Arctic operations
6.1 General
6.2 Information on climate conditions <\/td>\n<\/tr>\n
17<\/td>\n6.3 Illumination
6.4 Visibility
6.4.1 General <\/td>\n<\/tr>\n
18<\/td>\n6.4.2 Preventing glare
6.5 Physiological and psychosocial effects (human performance) <\/td>\n<\/tr>\n
19<\/td>\n6.6 Noise and vibration
6.6.1 General
6.6.2 Noise
6.6.3 Vibration
6.6.4 Hand\u2013arm vibration
6.7 Hazardous chemicals <\/td>\n<\/tr>\n
20<\/td>\n6.8 UV radiation
6.9 Wildlife
7 Environmental and cold climate preconditions
7.1 General
7.2 Metocean data <\/td>\n<\/tr>\n
21<\/td>\n7.3 Assessment of the need for permanent weather protection
7.4 Area wind chill temperature (WCT) \u2014 CFD simulations <\/td>\n<\/tr>\n
22<\/td>\n8 Working environment design philosophy and technical solutions
8.1 General
8.2 Design process and design requirements for Arctic conditions <\/td>\n<\/tr>\n
23<\/td>\n8.3 Enclosures for weather protection
8.4 Anti-icing, anti-freezing and de-icing <\/td>\n<\/tr>\n
24<\/td>\n8.5 Anti-icing and anti-freezing measures <\/td>\n<\/tr>\n
25<\/td>\n8.6 De-icing measures
8.7 Work areas and access ways protection <\/td>\n<\/tr>\n
26<\/td>\n8.8 Falling ice protection
8.9 Anti-slip systems
8.10 Cold surfaces protection
8.11 Safety equipment <\/td>\n<\/tr>\n
27<\/td>\n8.12 Heat tracing and insulation
8.13 Hospital
8.14 Living quarters
8.15 Cabins
9 Operational requirements for prevention and management of cold-related problems
9.1 General <\/td>\n<\/tr>\n
28<\/td>\n9.2 Buddy control system
9.3 Background
9.4 Cold risk management system <\/td>\n<\/tr>\n
29<\/td>\n9.5 Cold risk assessment
9.5.1 General <\/td>\n<\/tr>\n
30<\/td>\n9.5.2 Identification of cold-related problems at work (Stage 1)
9.5.3 Determination of wind cooling (wind chill exposure) (Stage 2) <\/td>\n<\/tr>\n
32<\/td>\n9.5.4 Work, warm-up and recovery regimes (Stage 3) <\/td>\n<\/tr>\n
33<\/td>\n9.6 Clothing and personal protection regimes
9.6.1 General <\/td>\n<\/tr>\n
34<\/td>\n9.6.2 Hand protection <\/td>\n<\/tr>\n
35<\/td>\n9.6.3 Foot protection
9.6.4 Face protection \u2014 Cold air protection <\/td>\n<\/tr>\n
36<\/td>\n9.6.5 Chemical respiratory protection
9.7 Fitness for work in the Arctic environment
9.7.1 General
9.7.2 Cold-related health risks
9.7.3 Cold-related health assessment <\/td>\n<\/tr>\n
37<\/td>\n9.7.4 Medical health examination associated with operation in the cold
9.7.5 Suggested health requirements <\/td>\n<\/tr>\n
38<\/td>\n9.7.6 Other aspects relevant to assessment of fitness for work <\/td>\n<\/tr>\n
39<\/td>\n9.8 Health and stress management
9.8.1 Psychosocial stress exposure
9.8.2 Health and stress management
9.9 First aid and medical provision
9.9.1 Medical support assessment
9.9.2 Medical facilities <\/td>\n<\/tr>\n
40<\/td>\n9.9.3 Medical evacuation
10 Education, training and supervision <\/td>\n<\/tr>\n
42<\/td>\nAnnex A (informative) Working environment studies and deliverables in project development <\/td>\n<\/tr>\n
44<\/td>\nAnnex B (informative) Assessment of weather protection <\/td>\n<\/tr>\n
48<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Petroleum and natural gas industries. Arctic operations. Working environment<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2017<\/td>\n50<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":268717,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-268714","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/268714","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/268717"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=268714"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=268714"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=268714"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}