{"id":268714,"date":"2024-10-19T17:58:36","date_gmt":"2024-10-19T17:58:36","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-351012017\/"},"modified":"2024-10-25T14:03:05","modified_gmt":"2024-10-25T14:03:05","slug":"bs-iso-351012017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-351012017\/","title":{"rendered":"BS ISO 35101:2017"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4 Abbreviated terms 5 Risk management 5.1 General <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.2 Management of working environment risks in the design process 5.3 Mitigating measures \u2014 Risk reduction principles 5.3.1 Hierarchy of controls <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.3.2 ALARP 5.4 Special assessment in Arctic environment 5.4.1 Input to design specification <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.4.2 Risk assessments in operation \u2014 Operational solutions 6 Management of working environment hazards in Arctic operations 6.1 General 6.2 Information on climate conditions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.3 Illumination 6.4 Visibility 6.4.1 General <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.4.2 Preventing glare 6.5 Physiological and psychosocial effects (human performance) <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.6 Noise and vibration 6.6.1 General 6.6.2 Noise 6.6.3 Vibration 6.6.4 Hand\u2013arm vibration 6.7 Hazardous chemicals <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.8 UV radiation 6.9 Wildlife 7 Environmental and cold climate preconditions 7.1 General 7.2 Metocean data <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 7.3 Assessment of the need for permanent weather protection 7.4 Area wind chill temperature (WCT) \u2014 CFD simulations <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 8 Working environment design philosophy and technical solutions 8.1 General 8.2 Design process and design requirements for Arctic conditions <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 8.3 Enclosures for weather protection 8.4 Anti-icing, anti-freezing and de-icing <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8.5 Anti-icing and anti-freezing measures <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8.6 De-icing measures 8.7 Work areas and access ways protection <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8.8 Falling ice protection 8.9 Anti-slip systems 8.10 Cold surfaces protection 8.11 Safety equipment <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 8.12 Heat tracing and insulation 8.13 Hospital 8.14 Living quarters 8.15 Cabins 9 Operational requirements for prevention and management of cold-related problems 9.1 General <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 9.2 Buddy control system 9.3 Background 9.4 Cold risk management system <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 9.5 Cold risk assessment 9.5.1 General <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 9.5.2 Identification of cold-related problems at work (Stage 1) 9.5.3 Determination of wind cooling (wind chill exposure) (Stage 2) <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 9.5.4 Work, warm-up and recovery regimes (Stage 3) <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 9.6 Clothing and personal protection regimes 9.6.1 General <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 9.6.2 Hand protection <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 9.6.3 Foot protection 9.6.4 Face protection \u2014 Cold air protection <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 9.6.5 Chemical respiratory protection 9.7 Fitness for work in the Arctic environment 9.7.1 General 9.7.2 Cold-related health risks 9.7.3 Cold-related health assessment <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 9.7.4 Medical health examination associated with operation in the cold 9.7.5 Suggested health requirements <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 9.7.6 Other aspects relevant to assessment of fitness for work <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 9.8 Health and stress management 9.8.1 Psychosocial stress exposure 9.8.2 Health and stress management 9.9 First aid and medical provision 9.9.1 Medical support assessment 9.9.2 Medical facilities <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 9.9.3 Medical evacuation 10 Education, training and supervision <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Annex A (informative) Working environment studies and deliverables in project development <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Annex B (informative) Assessment of weather protection <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Petroleum and natural gas industries. Arctic operations. Working environment<\/b><\/p>\n |