{"id":255298,"date":"2024-10-19T16:52:34","date_gmt":"2024-10-19T16:52:34","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-61980-22019\/"},"modified":"2024-10-25T12:19:30","modified_gmt":"2024-10-25T12:19:30","slug":"bsi-pd-iec-ts-61980-22019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-61980-22019\/","title":{"rendered":"BSI PD IEC TS 61980-2:2019"},"content":{"rendered":"

IEC TS 61980-2:2019 applies to communication between electric road vehicle (EV) and wireless power transfer (WPT) systems when connected to the supply network, at standard supply voltages per IEC 60038 up to 1000 V AC and up to 1500 V DC. This document also applies to wireless power transfer equipment supplied from on-site storage systems (e.g. buffer batteries) at standard supply voltages per IEC 60038 up to 1000 V AC and up to 1500 V DC. The aspects covered in this document include \u2013 standards for operational characteristics and functional characteristics of the WPT communication subsystem, \u2013 communication requirements for WPT system while driving, which are under consideration, \u2013 communication requirements for two- and three-wheel vehicles, which are under consideration, and \u2013 communication requirements for bidirectional power transfer are under consideration This document does not apply to \u2013 safety aspects related to maintenance, and \u2013 trolley buses, rail vehicles and vehicles designed primarily for use off-road.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nundefined <\/td>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
9<\/td>\nFOREWORD <\/td>\n<\/tr>\n
11<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
12<\/td>\n1 Scope
2 Normative references <\/td>\n<\/tr>\n
13<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
16<\/td>\n4 Abbreviated terms
5 Communication of WPT systems
5.1 General
5.2 System architecture <\/td>\n<\/tr>\n
17<\/td>\nFigures
Figure 1 \u2013 Possible elements of combination in a communication subsystem <\/td>\n<\/tr>\n
18<\/td>\n5.3 General system requirements
5.3.1 General
5.3.2 Interoperability requirements
5.3.3 System configuration
Figure 2 \u2013 WPT site with a single supply device <\/td>\n<\/tr>\n
19<\/td>\n5.3.4 Communication security
5.3.5 Timing
6 Power transfer process with respect to communication
6.1 General
6.2 Overview of operation process activities
Figure 3 \u2013 Operation process of activities for the WPT <\/td>\n<\/tr>\n
20<\/td>\n6.3 Activities
6.3.1 Communication setup and service selection
6.3.2 Reject WPT session
6.3.3 Fine positioning <\/td>\n<\/tr>\n
21<\/td>\n6.3.4 Pairing
6.3.5 Final compatibility check <\/td>\n<\/tr>\n
22<\/td>\n6.3.6 Initial alignment check
6.3.7 Prepare power transfer <\/td>\n<\/tr>\n
23<\/td>\n6.3.8 Time scheduled power transfer (informative) <\/td>\n<\/tr>\n
24<\/td>\n6.3.9 Perform power transfer <\/td>\n<\/tr>\n
25<\/td>\n6.3.10 Stop power transfer <\/td>\n<\/tr>\n
26<\/td>\n6.3.11 WPT session
6.3.12 EV leaves WPT spot
6.3.13 Safety monitoring and diagnostics <\/td>\n<\/tr>\n
27<\/td>\n6.3.14 Terminate communication
6.3.15 Terminate safety monitoring and diagnostics
6.3.16 Wake-up after power outage <\/td>\n<\/tr>\n
28<\/td>\n7 Control process states
7.1 Supply device state definitions
7.1.1 Supply device state diagram
Figure 4 \u2013 Supply device state diagram <\/td>\n<\/tr>\n
29<\/td>\n7.1.2 Stand by (WPT_S_SB)
7.1.3 Service initiated (WPT_S_SI)
Figure 5 \u2013 Activity communication setup <\/td>\n<\/tr>\n
30<\/td>\n7.1.4 WPT session rejected
Figure 6 \u2013 Activity service selection <\/td>\n<\/tr>\n
31<\/td>\n7.1.5 Awaiting alignment (WPT_S_AA)
Figure 7 \u2013 Activity reject WPT session <\/td>\n<\/tr>\n
32<\/td>\nFigure 8 \u2013 Activity from fine positioning to initial alignment check <\/td>\n<\/tr>\n
33<\/td>\n7.1.6 Idle (WPT_S_IDLE)
Figure 9 \u2013 Activity prepare power transfer <\/td>\n<\/tr>\n
34<\/td>\n7.1.7 Power transfer (WPT_S_PT)
Figure 10 \u2013 Activity terminate WPT session
Figure 11 \u2013 Activity Sleep <\/td>\n<\/tr>\n
35<\/td>\n7.1.8 Service terminated occupied (WPT_S_STO)
Figure 12 \u2013 Activity stop power transfer <\/td>\n<\/tr>\n
36<\/td>\n7.1.9 Out of service (WPT_S_OOS)
7.1.10 Sleep mode WPT_S_SLP
Figure 13 \u2013 Activity EV leaves WPT spot <\/td>\n<\/tr>\n
37<\/td>\n7.2 Supply device state transitions
Figure 14 \u2013 Activity wake-up
Tables
Table 1 \u2013 Supply device state transitions <\/td>\n<\/tr>\n
38<\/td>\n7.3 EV device state definitions
7.3.1 EV device state diagram <\/td>\n<\/tr>\n
39<\/td>\n7.3.2 Stand by (WPT_V_SB)
Figure 15 \u2013 EV device state diagram <\/td>\n<\/tr>\n
40<\/td>\n7.3.3 Service initiated (WPT_V_SI)
Figure 16 \u2013 Activity communication setup (EV device state)
Figure 17 \u2013 Activity service selection (EV device state) <\/td>\n<\/tr>\n
41<\/td>\n7.3.4 Awaiting alignment (WPT_V_AA)
Figure 18 \u2013 Activity from fine positioning to initial alignment check (EV device state) <\/td>\n<\/tr>\n
42<\/td>\n7.3.5 Idle (WPT_V_IDLE)
7.3.6 Power transfer active (WPT_V_PT)
7.3.7 Off (WPT_V_OFF)
7.4 EV state transitions
Figure 19 \u2013 Activity prepare power transfer (EV device state) <\/td>\n<\/tr>\n
43<\/td>\n7.5 Exception handling
7.5.1 General
7.5.2 Supply device exception handling (WPT_S_ERR)
7.5.3 EV device exception handling (WPT_V_ERR)
Table 2 \u2013 EV device state transitions <\/td>\n<\/tr>\n
44<\/td>\n7.5.4 Exception descriptions
8 Communication parameter for WPT systems
8.1 General
8.2 General parameters
8.3 Communication setup
Table 3 \u2013 Exception handling <\/td>\n<\/tr>\n
45<\/td>\n8.4 Service selection
Table 4 \u2013 Service selection EVCC request parameters
Table 5 \u2013 Service selection SECC response parameters <\/td>\n<\/tr>\n
46<\/td>\nTable 6 \u2013 Method list for fine positioning <\/td>\n<\/tr>\n
47<\/td>\n8.5 Fine positioning
8.5.1 General
8.5.2 Starting fine positioning
8.5.3 Fine positioning data exchange
Table 7 \u2013 Method list for pairing
Table 8 \u2013 Method list for initial alignment
Table 9 \u2013 Fine positioning response <\/td>\n<\/tr>\n
48<\/td>\n8.5.4 Terminating fine positioning
8.6 Pairing
8.6.1 General
8.6.2 Start pairing
Table 10 \u2013 Pairing start request
Table 11 \u2013 Pairing start response <\/td>\n<\/tr>\n
49<\/td>\n8.7 Initial alignment check
8.7.1 General
8.7.2 Initial alignment check request\/response
Table 12 \u2013 Pairing confirmation request
Table 13 \u2013 Pairing confirmation response
Table 14 \u2013 Initial alignment check request
Table 15 \u2013 Initial alignment check response <\/td>\n<\/tr>\n
50<\/td>\n8.8 Prepare power transfer
8.8.1 General
8.8.2 Final compatibility check
Table 16 \u2013 Final compatibility check request parameters
Table 17 \u2013 Final compatibility check response parameters <\/td>\n<\/tr>\n
51<\/td>\n8.9 Perform power transfer
Table 18 \u2013 Perform power transfer request parameters
Table 19 \u2013 Perform power transfer response parameters <\/td>\n<\/tr>\n
52<\/td>\n8.10 Stop power transfer
8.11 Terminate communication
8.12 Exception handling
Table 20 \u2013 Error request parameters
Table 21 \u2013 Error respond parameters <\/td>\n<\/tr>\n
53<\/td>\n9 Message sequences of communication with WLAN
9.1 General
9.2 Messages of communication for power transfer
9.3 Communication setup
9.4 Service selection <\/td>\n<\/tr>\n
54<\/td>\n9.5 Fine positioning
9.6 Pairing
9.7 Final compatibility check
9.8 Initial alignment check <\/td>\n<\/tr>\n
55<\/td>\n9.9 Prepare power transfer
9.10 Perform power transfer <\/td>\n<\/tr>\n
56<\/td>\n9.11 Stop power transfer
9.12 Terminate communication <\/td>\n<\/tr>\n
57<\/td>\nAnnex A (informative) Use cases
A.1 General
Figure A.1 \u2013 Use cases particularly for wireless power transfer <\/td>\n<\/tr>\n
58<\/td>\nFigure A.2 \u2013 Use cases from ISO 15118-1 reusable for WPT systems <\/td>\n<\/tr>\n
59<\/td>\nA.2 Use case descriptions
A.2.1 UC select supply device
Table A.1 \u2013 UC select supply device <\/td>\n<\/tr>\n
60<\/td>\nFigure A.3 \u2013 Activity diagram for UC select supply device <\/td>\n<\/tr>\n
61<\/td>\nA.2.2 UC service selection
Table A.2 \u2013 UC service selection <\/td>\n<\/tr>\n
62<\/td>\nA.2.3 UC fine positioning
Table A.3 \u2013 UC fine positioning <\/td>\n<\/tr>\n
63<\/td>\nFigure A.4 \u2013 Activity diagram for UC fine positioning <\/td>\n<\/tr>\n
64<\/td>\nA.2.4 UC prepare power transfer
Table A.4 \u2013 UC prepare power transfer <\/td>\n<\/tr>\n
65<\/td>\nFigure A.5 \u2013 Activity diagram for UC prepare power transfer <\/td>\n<\/tr>\n
66<\/td>\nA.2.5 UC safety monitoring and diagnostics
A.2.6 UC perform power transfer
Table A.5 \u2013 UC safety monitoring and diagnostics
Table A.6 \u2013 UC perform power transfer <\/td>\n<\/tr>\n
67<\/td>\nA.2.7 UC stop power transfer
Figure A.6 \u2013 Activity diagram for UC perform power transfer
Table A.7 \u2013 UC stop power transfer <\/td>\n<\/tr>\n
68<\/td>\nFigure A.7 \u2013 Activity diagram for UC stop power transfer <\/td>\n<\/tr>\n
69<\/td>\nA.2.8 UC sleep mode (optional)
Table A.8 \u2013 UC sleep mode <\/td>\n<\/tr>\n
70<\/td>\nFigure A.8 \u2013 Activity diagram for UC sleep mode <\/td>\n<\/tr>\n
71<\/td>\nAnnex B (informative)Physical definition of links and signals
B.1 General
B.2 System architecture
B.3 WLAN
B.4 SR signal <\/td>\n<\/tr>\n
72<\/td>\nB.5 LF signal (EV device to supply device) <\/td>\n<\/tr>\n
73<\/td>\nFigure B.1 \u2013 Example arrangement of the auxiliary LF antennas for the primary device (left) and the vehicle (right) <\/td>\n<\/tr>\n
74<\/td>\nB.6 Magnetic vector (EV device to supply device)
B.7 LPE (supply device to EV device)
Figure B.2 \u2013 Example arrangement of the auxiliary LF antennas for the primary device (left) and the EV (right) <\/td>\n<\/tr>\n
75<\/td>\nAnnex C (informative)Usage of supplemental signals
C.1 General
C.2 Fine positioning
C.2.1 General
C.2.2 Manual
C.2.3 Low power excitation (LPE) <\/td>\n<\/tr>\n
76<\/td>\nC.2.4 LF signal
Table C.1 \u2013 Data of the antenna arrangement at EV to send to SECC <\/td>\n<\/tr>\n
77<\/td>\nTable C.2 \u2013 Data of the antenna arrangement at primary device to send to EVCC <\/td>\n<\/tr>\n
78<\/td>\nFigure C.1 \u2013 Explanation of parameters for LF fine positioning
Table C.3 \u2013 Data exchanged between EVCC and SECC during fine positioning <\/td>\n<\/tr>\n
79<\/td>\nC.2.5 Magnetic vector
C.3 Pairing
C.3.1 General
C.3.2 Coding pattern specification <\/td>\n<\/tr>\n
80<\/td>\nC.3.3 Low power excitation (LPE)
Figure C.2 \u2013 Coding pattern timing and examples <\/td>\n<\/tr>\n
81<\/td>\nC.3.4 SR signal
C.3.5 LF signal
C.3.6 Magnetic vector <\/td>\n<\/tr>\n
82<\/td>\nC.4 Initial alignment check
C.4.1 General
C.4.2 LPE target current check <\/td>\n<\/tr>\n
83<\/td>\nC.4.3 RSSI method
Figure C.3 \u2013 Symmetrical antenna configuration for signal comparison with zero natural offset <\/td>\n<\/tr>\n
84<\/td>\nC.5 Continuous alignment check
C.5.1 General
C.5.2 System anomaly check
Figure C.4 \u2013 Symmetrical antenna configuration for signal comparison with given natural offset <\/td>\n<\/tr>\n
85<\/td>\nC.5.3 SR signal
C.6 Emergency shutdown
C.6.1 General
C.6.2 RF signal
C.6.3 Power termination <\/td>\n<\/tr>\n
86<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Electric vehicle wireless power transfer (WPT) systems – Specific requirements for communication between electric road vehicle (EV) and infrastructure<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2019<\/td>\n88<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":255301,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-255298","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/255298","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/255301"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=255298"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=255298"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=255298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}