{"id":216658,"date":"2024-10-19T14:03:10","date_gmt":"2024-10-19T14:03:10","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-172932020-2\/"},"modified":"2024-10-25T07:07:31","modified_gmt":"2024-10-25T07:07:31","slug":"bs-en-172932020-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-172932020-2\/","title":{"rendered":"BS EN 17293:2020"},"content":{"rendered":"

This document specifies requirements for manufacturing components for temporary works equipment:<\/p>\n

    \n
  1. \n

    in a factory; or<\/p>\n<\/li>\n

  2. \n

    on site where manufacturing in a factory is not practicable.<\/p>\n<\/li>\n<\/ol>\n

    This document specifies requirements for manufacturing components for temporary works equipment in addition or contrary to the requirements of EN 1090-2, EN 1090-3, EN 1090-4, EN 1090-5 and EN 1995-1-1.<\/p>\n

    Furthermore, this document specifies requirements for manufacturing timber components, designed according to Eurocodes, to be used in temporary works equipment.<\/p>\n

    This document does not specify requirements for erection and transportation of temporary works equipment.<\/p>\n

    PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n
    PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
    2<\/td>\nundefined <\/td>\n<\/tr>\n
    7<\/td>\n1 Scope
    2 Normative references <\/td>\n<\/tr>\n
    9<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
    10<\/td>\n4 General
    5 Manufacturer documentation
    5.1 Quality documentation
    5.2 Quality plan
    5.3 Safety of the erection works
    5.4 Execution documentation <\/td>\n<\/tr>\n
    11<\/td>\n5.5 Identification and traceability
    6 Materials <\/td>\n<\/tr>\n
    12<\/td>\n7 Requirements for welding monitoring class 2
    8 Steel components
    8.1 General <\/td>\n<\/tr>\n
    13<\/td>\n8.2 Special requirements
    8.2.1 Welding
    8.2.1.1 General
    8.2.1.2 Control procedure <\/td>\n<\/tr>\n
    15<\/td>\n8.2.2 Mechanical connections
    8.2.3 Galvanized components
    9 Aluminium components
    9.1 General <\/td>\n<\/tr>\n
    16<\/td>\n9.2 Special requirements
    9.2.1 Welding
    9.2.1.1 General
    9.2.1.2 Control procedure <\/td>\n<\/tr>\n
    17<\/td>\n9.2.2 Mechanical connections <\/td>\n<\/tr>\n
    18<\/td>\n10 Timber components
    10.1 General
    10.2 Glued joints <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

    Temporary works equipment. Execution. Requirements for manufacturing<\/b><\/p>\n\n\n\n\n
    Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
    BSI<\/b><\/a><\/td>\n2020<\/td>\n20<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":216660,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-216658","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/216658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/216660"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=216658"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=216658"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=216658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}