WRC volume 57 No. 01-02:2002
$27.95
Progress Reports Volume 57 No. 01-02
Published By | Publication Date | Number of Pages |
WRC | 2002 | 134 |
Contents
– PVRC Main and Executive Committee (Main/EC), February 5, 2002
– EPERC Report
– JPVRC Report
– PVRC Task Group on Continued Modernization of Codes (TGCMC), February 6 and 7, 2002
– PVRC Committee on Dynamic Analysis and Testing (DAT), February 5, 2002
– PVRC Committee on Welds (WMWP), February 5, 2002
– PVRC Committee on Thermal Mechanical Effects on Materials (TME), February 5, 2002
– PVRC Committee on Piping, Nozzles and Vessels (PNV), February 4, 2002
– PVRC Subcommittee on Flexibility Models and Stress Intensification Factors (PNV-FMSIF), February 4, 2002
– PVRC Subcommittee on Flexibility Models and Stress Intensification Factors (PNV-FMSIF), October 8, 2001
– PVRC Subcommittee on Shell Intersections (PNV-SI), February 4, 2002
– PVRC Committee on Elevated Temperature Design (ETD), February 5, 2002
– Root Causes of the Transient Tube Temperature Anamolies Measured in Horizontal Gas Path HRSGs
– PVRC Committee on Bolted Flanged Connections (BFC), October 2, 2001
– PRVC Subcommittee on Gasket Testing and Elevated Temperature Joint Behavior (BFC-GTETJB), October 9, 2001
– PVRC Subcommittee on Flange Parameter Studies (BFC-FPS), October 9, 2001
– PVRC Committee on Bolted Flanged Connections (BFC), May 31, 2001