WRC volume 44 No. 07-08:1989
$27.95
Progress Reports Volume 44 No. 07-08
Published By | Publication Date | Number of Pages |
WRC | 1989 | 98 |
Contents
– Executive and Main Committee, June 7, 1989
– Task Group on Continued Operation of Equipment, June 5, 1989
– Steering and Technical Committees on Piping Systems, June 5, 1989
– Report on Review and Simplificaiton of ASME Sections III & XI
– JPVRC Progress Report, March 1989
– Design Division, June 7, 1989
– Joint Task Group on Elevated Design Behavior of Bolted Flanges, June 6, 1989
– Subcommittee on Reinforced Openings and External Loadings, June 6, 1989
– Subcommittee on Piping, Pumps, and Valves, June 7, 1989
– Subcommittee on Dynamic Analysis, June 6, 1989
– Subcommittee on Elevated Temperature Design, June 7, 1989
– Materials and Fabrication Division, June 7, 1989
– Subcommittee on Nondestructive Examination of Components, January 16, 1989
– Subcommittee on Thermal and Mechanical Effects on Materials, June 7, 1989
– Task Group on Damage Assessment of Life Extension and s/c on Elevated Temperature Behavior of Components
– Subcommittee on Failure Modes of Components, October 12, 1988