Shopping Cart

No products in the cart.

WRC volume 43 No. 03-04:1988

$27.95

Progress Reports Volume 43 No. 03-04

Published By Publication Date Number of Pages
WRC 1988 96
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Contents

– Executive and Main Committee and Attachments, January 27, 1988
– PVRC Steering/Technical Committees on Piping Systems, January 25, 1988
– Technical Committee on Piping Systems, Task Group on Independent Support Motion, January 25, 1988
– PVRC Committee on Review and Simplification of Nuclear Codes and Standards, January 25-26, 1988
– Design Division, January 26, 1988
– Subcommittee on Reinforced Openings and External Loadings, January 25, 1988
– Subcommittee on Dynamic Analysis of Pressure Vessel Components, January 26, 1988
– Subcommittee on Bolted Flanged Connections, January 26, 1988
– Joint Task Group on Elevated Temperature Behavior of Bolted Flanges, January 25, 1988
– Subcommitteeon Shells and Ligaments, January 26, 1988
– Subcommittee on Elevated Temperature Design, January 26, 1988
– Materials and Fabrication Division, January 27, 1988
– Subcommittee on Nondestructive Examination of Components, January 26, 1988
– Subcommittee on Failure Modes of Components, January 26, 1988
– Subcommittee on Thermal and Mechanical Effects on Materials, January 26, 1988
– Subcommittee on Welds, January 27, 1988

WRC volume 43 No. 03-04:1988
$27.95