Shopping Cart

No products in the cart.

NFPA 415 2016

$80.71

NFPA 415: Standard on Airport Terminal Buildings, Fueling Ramp Drainage, and Loading Walkways

Published By Publication Date Number of Pages
NFPA 2016 26
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Airport safety demands compliance with the latest edition of NFPA 415. Protect people and property from unique fire hazards in airport terminal complexes. NFPA 415: Airport Terminal Buildings, Fueling Ramp Drainage, and Loading Walkways is the trusted resource used by engineers, designers, installers, contractors, and airport safety managers for one-stop access to requirements for: Fire protection of airport terminal buildings Fire testing and design criteria for aircraft loading walkways Design and maintenance of the drainage system of an aircraft fueling ramp to control the flow of fuel that might be spilled on a ramp and minimize possible danger Changes in the 2016 NFPA 415 include: Updated references throughout Aircraft loading walkways can now incorporate transparent or translucent walls, windows, or surfaces. Update now to follow the latest criteria for fire protection from the host of special hazards present at airport terminal buildings, such as the possibility of spilled fuel.

PDF Catalog

PDF Pages PDF Title
2 Important Notices and Disclaimers
3 Additional Notices and Disclaimers
7 Chapter 1 Administration
1.1 Scope.
1.2 Purpose.
1.3 Application.
Chapter 2 Referenced Publications
2.1 General.
2.2 NFPA Publications.
8 2.3 Other Publications.
2.4 References for Extracts in Mandatory Sections. (Reserved)
Chapter 3 Definitions
3.1 General.
3.2 NFPA Official Definitions.
3.3 General Definitions.
Chapter 4 Airport Terminal Buildings
4.1 General.
9 4.2 Heating, Ventilating, and Air Conditioning.
4.3 Exits.
4.4 Electrical.
4.5 Fire Protection.
10 Chapter 5 Aircraft Fueling Ramp Drainage
5.1 Aircraft Fueling Ramp Slope and Drain Design.
5.2 Drain and Separator Maintenance.
Chapter 6 Aircraft Loading Walkways
6.1 Basic Design.
6.2 Requirements for All Aircraft Loading Walkways.
11 6.3 Materials.
6.4 Fire Tests.
14 6.5 Fire Suppression Systems.
15 Annex A Explanatory Material
18 Annex B Building Construction Types
Annex C Glazing Materials
20 Annex D Informational References
NFPA 415 2016
$80.71