BS ISO 22192:2021
$198.66
Bunkering of marine fuel using the Coriolis mass flow meter (MFM) system
Published By | Publication Date | Number of Pages |
BSI | 2021 | 58 |
This document specifies procedures and requirements for the transfer of bunkers to vessels by bunker tankers using the Coriolis mass flow meter (MFM) system. It encompasses the process leading to the approval of the MFM system as installed on bunker tankers and post-approval bunkering operation. It covers terminology, specifications, requirements and procedures on metrology, system integrity, metering system selection and installation, MFM system verification, bunker delivery and dispute handling.
Local and international regulations, such as the International Convention for the Prevention of Pollution from Ships (MARPOL) can apply.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
7 | Foreword |
8 | Introduction |
9 | 1 Scope 2 Normative references 3 Terms and definitions |
15 | 4 General requirements (safety, health and the environment) 5 Metrological requirements 5.1 General 5.2 Mass flow meter requirement |
16 | 5.3 Mass flow meter system requirements |
17 | 5.4 Post approval maintenance 5.4.1 Meter zero verification frequency 5.4.2 Zero verification procedure 5.4.3 Meter and ancillary devices verification and/or calibration frequency 5.4.4 Software upgrade/ software update |
18 | 6 System integrity requirements 6.1 General 6.2 Metrological control 6.2.1 Documentation 6.2.2 Type approval and pattern evaluation 6.3 Security features 6.3.1 Equipment security 6.3.2 Software security |
19 | 6.3.3 Data security 6.3.4 Critical alarm 6.4 Installation and commissioning 6.4.1 Pre-installation and MFM system sealing plan 6.4.2 Installation and re-installation 6.4.3 Commissioning |
20 | 6.4.4 Re-commissioning 6.5 Operational security 6.6 Maintenance and control of MFM system 6.6.1 Inspection and verification 6.6.2 Breaking of seals and re-sealing of MFM system 7 Meter selection and installation requirements 7.1 General |
21 | 7.2 Site survey onboard tankers 7.3 Meter selection 7.4 Meter installation |
22 | 7.5 Meter commissioning 8 MFM system verification requirements 9 Metering procedures 9.1 General 9.2 Documentation 9.2.1 General |
23 | 9.2.2 Pre-delivery documentation 9.2.3 Post-delivery documentation 9.3 Additional documentation for bunker surveyor |
24 | 9.3.3 Survey time log and statement of facts 9.4 Additional documentation for bunker tanker 9.4.1 Meter totalizer log 9.4.2 Documents carried onboard the bunker tanker |
25 | 9.5 Planning for bunkering operation 9.6 Pre-delivery procedures 9.6.1 Flow measurement conditions and checks on system integrity 9.6.2 Pre-delivery conference 9.6.3 Bunker requisition form (mass flow metering) |
26 | 9.6.4 Mass flow metering system seals checklist 9.6.5 Meter reading record form (delivery) |
27 | 9.7 Delivery procedures 9.7.1 General 9.7.2 Start of delivery |
28 | 9.7.3 End of delivery |
29 | 9.8 Post-delivery procedures and checks 9.8.1 Meter reading record form (delivery) 9.8.2 Mass flow metering system seals checklist 9.8.3 Bunker metering ticket 9.8.4 Bunker delivery note |
30 | 9.8.5 Custody transfer quantity |
31 | 9.9 Others 9.9.1 MFM system failure 9.9.2 Quantity dispute 10 Sampling |
32 | Bibliography |
33 | Annex A (informative) Safety, health and the environment |
37 | Annex B (informative) Uncertainty budget table |
38 | Annex C (informative) Metrological and system integrity requirements |
39 | Annex D (informative) Procedures for zero verification |
40 | Annex E (informative) Sealable bolts and nuts for blanks and ancillary device |
42 | Annex F (informative) Request for information checklist |
44 | Annex G (informative) Typical schematic diagram for MFM system (for delivery) |
45 | Annex H (normative) Example of bunker requisition form (mass flow metering) |
46 | Annex I (informative) Example of mass flow metering system seals checklist |
47 | Annex J (informative) Example of meter reading record form (delivery) |
48 | Annex K (informative) Example of bunker metering ticket |
49 | Annex L (informative) Bunkering pre-delivery safety checklist |
52 | Annex M (informative) Example of survey time log |
54 | Annex O (informative) Example of meter totalizer log |
56 | Annex P (informative) Example of letter of protest |
57 | Annex Q (informative) Quantity dispute procedures and documents |