BS ISO 20794-5:2020
$198.66
Road vehicles. Clock extension peripheral interface (CXPI) – Application layer conformance test plan
Published By | Publication Date | Number of Pages |
BSI | 2020 | 66 |
This document specifies the conformance test plan for ISO 20794-2:2020implementations.
It specifies conformance test cases related to:
-
concept of operation;
-
network management;
-
transfer management; and
-
error management.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
7 | Foreword |
8 | Introduction |
11 | 1 Scope 2 Normative references 3 Terms and definitions |
12 | 4 Symbols and abbreviated terms 4.1 Symbols |
13 | 4.2 Abbreviated terms 5 Conventions |
14 | 6 General test specification considerations 6.1 General 6.2 Test conditions 6.3 IUT requirements 6.4 CTC definition |
15 | 6.5 Test system set-up |
16 | 6.6 Configuration of test system and IUT 6.6.1 General |
17 | 6.6.2 IUT-specific set-up parameters |
18 | 6.6.3 User_Specific configurations 6.6.4 W/S_Init configurations 6.6.5 W/S_Passive configurations 6.6.6 W/S_RdySleep configurations 6.6.7 W/S_NotRdySleep configurations |
19 | 6.6.8 A_WSSup configurations 6.6.9 NonW/S configurations 6.6.10 ErrDet configurations 6.6.11 Event configurations 6.6.12 Polling configurations |
20 | 6.7 SUT initialisation 6.7.1 General 6.7.2 Default initialisation 6.7.3 Sleep initialisation 6.7.4 Power-off initialisation 6.7.5 Transmission prohibition initialisation 6.7.6 Clock supply of secondary clock master initialisation 7 Application conformance test plan 7.1 General 7.2 Network management 7.2.1 General |
21 | 7.2.2 State transition definition 7.2.3 State transition CTCs |
25 | 7.2.4 Wake-up request/notification of master node trigger CTCs |
29 | 7.2.5 Wake-up request/notification of slave node trigger CTCs |
36 | 7.2.6 Sleep request/notification CTCs |
43 | 7.2.7 Network Management multi clock master processing CTCs |
46 | 7.3 Fault management 7.3.1 Error detection/recovery CTCs |
53 | 7.3.2 CXPI network error CTCs |
55 | 7.3.3 SCT error CTCs |
56 | 7.3.4 Error notification between CXPI nodes CTCs |
58 | 8 Application layer conformance test plan 8.1 General 8.2 Transfer management CTCs 8.2.1 General 8.2.2 7.CTC_10.1 – Master node event-triggered method |
59 | 8.2.3 7.CTC_10.2 – Slave node event-triggered method 8.2.4 7.CTC_10.3 – Master node polling method |
60 | 8.2.5 7.CTC_10.4 – Slave node polling method |
61 | 8.2.6 7.CTC_10.5 – Behaviour of unknown or invalid ReqId reception |
62 | 8.2.7 7.CTC_10.6 – Master node sets unused bits in response message 8.2.8 7.CTC_10.7 – Slave node sets unused bits in response message |
64 | Bibliography |