ASTM-E964 2006
$40.63
E964-06e1 Standard Practice for Measuring Benefit-to-Cost and Savings-to-Investment Ratios for Buildings and Building Systems
Published By | Publication Date | Number of Pages |
ASTM | 2006 | 10 |
1.1 This practice covers a procedure for calculating and interpreting benefit-to-cost ratios (BCR) and savings-to-investment ratios (SIR) as an aid for making building-related decisions.
1.2 A basic premise of the BCR and SIR methods is that future as well as present benefits and costs arising from a decision are important to that decision, and, if measurable in dollars, should be included in calculating the BCR and SIR.
1.3 Dollar amounts used to calculate BCR and SIR are all discounted, that is, expressed in time-equivalent dollars, either in present value or uniform annual value terms.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Scope Referenced Documents |
2 | Terminology Summary of Practice Significance and Use Procedure Objectives, Constraints, and Alternatives |
3 | Data and Assumptions Calculation of BCR and SIR |
4 | Analysis of BCR or SIR Results and the Decision |
5 | BCR or SIR Report Applications TABLE 1 TABLE 2 TABLE 3 TABLE 4 |
6 | TABLE 5 |
7 | Keywords X1. USING THE BCR TO EVALUATE A REAL ESTATE INVESTMENT: ILLUSTRATION X1.1 X1.2 X1.3 X1.4 X1.5 Alternatives Considered: X1.6 |
8 | X1.7 X1.8 X1.9 TABLE X1.1 |
9 | TABLE X1.2 TABLE X1.3 TABLE X1.4 |
10 | TABLE X1.5 TABLE X1.6 TABLE X1.7 |