{"id":359123,"date":"2024-10-20T01:24:37","date_gmt":"2024-10-20T01:24:37","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pas-20302012-edition-2\/"},"modified":"2024-10-26T02:04:16","modified_gmt":"2024-10-26T02:04:16","slug":"bsi-pas-20302012-edition-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pas-20302012-edition-2\/","title":{"rendered":"BSI PAS 2030:2012 Edition 2"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4 Installation process 4.1 Method statement 4.2 Energy efficiency measure design specification 4.3 Installation location information <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.4 Installation methods 4.5 Installation equipment and tools 4.6 Checking, handling and storage <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.7 Provision of installation instructions to operatives 4.8 Intermediate inspections 4.9 People 4.10 Engagement of subcontract installers 4.11 Commissioning <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.12 Handover 4.13 Installation control 4.14 Installation documents and record keeping <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5 Installation process management 5.1 Operation and process oversight 5.2 Pre-installation survey 5.3 Action in respect of Intermediate inspection 5.4 Installation process change <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.5 Process continuity plan 5.6 Process control 5.7 Internal audit and corrective action 5.8 Installation process records 5.9 Business and financial probity <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6 Service provision 6.1 Complaints procedure 6.2 Interaction with customers 7 Claims of conformity 7.1 General claims requirement 7.2 Declarations of conformity <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 8 Documents essential to the application of the Annexes of this PAS 8.1 Use of the identified documents 8.2 British Standards <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 8.3 Institution of Gas Engineer and Managers \u2013 Standards 8.4 Energy Networks Association Engineering Recommendations 8.5 UKLPG 8.6 Department of Communities and Local Government 8.7 CITB constructionskills <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8.8 Common Minimum Technical Competence Annexes <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Annex A (normative) Energy efficiency measures and types with current and historic PAS 2030 annex references, arranged by measure category <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Annex B BFM energy efficiency measures B1 Measure BFM.1 Cavity wall insulation <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | B2 Measure BFM.2 Draught proofing <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | B3 Measure BFM.3 \u2013 Energy efficient glazing and doors <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | B4 Measure BFM.4 \u2013 External wall insulation <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | B5 Measure BFM.5 Flat roof insulation <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | B6 Measure BFM.6 Floor insulation <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | B7 Measure BFM 7 Hybrid wall insulation <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | B8 Measure BFM.8 Internal wall insulation <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | B9 Measure BFM.9 Loft insulation <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | B10 Measure BFM.10 Pitched roof insulation <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | B11 Measure BFM.11: Solar Blinds, Shutters and Shading Devices (internal and external) <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | Annex C BFM energy efficiency measures (normative) C1 Measure BSM.1 Chillers <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | C2 Measure BSM.2 Condensing boilers, natural gas-fired and liquefied petroleum gas-fired (domestic and non-domestic) <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | C3 Measure BSM.3 oil-fired condensing boilers <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | C4 Measure BSM.4 Flue-gas heat recovery devices <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | C5 Measure BSM.5: Heating system insulation (ducting, pipes and cylinders) <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | C6 Measure BSM.6 Heating, hot water system, air conditioning and ventilation controls <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | C7 Measure BSM.7 Hot water systems <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | C8 BSM.8 Mechanical Ventilation and Heat Recovery <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | C9 Measure BSM.9 Radiant heating (non-domestic) <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | C10 Measure BSM.10.1 Under-floor heating <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | C11 Measure BSM.11 Warm-air heating systems (domestic and non-domestic) <\/td>\n<\/tr>\n | ||||||
139<\/td>\n | C12 BSM.12 Water efficient taps and showers <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | Annex D BSE energy efficiency measures (normative) D1 Measure BSE.1 Electric storage heaters (including electric warm air heating units thatincorporate heat storage) <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | D2 Measure BSE.2 Lighting fittings, lighting systems and lighting system controls <\/td>\n<\/tr>\n | ||||||
153<\/td>\n | D3 Measure BSE.3 Variable speed drives for fans and pumps <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Improving the energy efficiency of existing buildings. Specification for installation process, process management and service provision<\/b><\/p>\n |