{"id":415283,"date":"2024-10-20T06:04:19","date_gmt":"2024-10-20T06:04:19","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-electricaltransmission-2022\/"},"modified":"2024-10-26T11:17:34","modified_gmt":"2024-10-26T11:17:34","slug":"asce-electricaltransmission-2022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-electricaltransmission-2022\/","title":{"rendered":"ASCE ElectricalTransmission 2022"},"content":{"rendered":"

Proceedings of the Electrical Transmission and Substation Structures Conference 2022, held in Orlando, Florida, October 2\u20136, 2022. Sponsored by the Structural Engineering Institute of ASCE.<\/p>\n

This collection contains 49 peer-reviewed papers on the analysis, design, construction, and maintenance of electrical transmission lines and substation structures and foundations.<\/p>\n

Topics include: wildfires; structural design and analysis; lattice towers; managing aging infrastructure; substations; loadings; foundations; special design considerations; and case studies.<\/p>\n

This proceedings will provide up-to-date information for engineers, suppliers, contractors, utility owners, and other professionals in the electrical transmission industry.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\n48446 ebook cover <\/td>\n<\/tr>\n
2<\/td>\n9780784484463
frontmatter.fm
Final p i Title ETS 2022 <\/td>\n<\/tr>\n
3<\/td>\nFinal p ii Notices ETS 2022 <\/td>\n<\/tr>\n
4<\/td>\nFinal p iii-vi Preface and Acknowledgments ETS 2022 <\/td>\n<\/tr>\n
8<\/td>\ntoc <\/td>\n<\/tr>\n
13<\/td>\n9780784484463_articles
9780784484463.001 <\/td>\n<\/tr>\n
25<\/td>\n9780784484463.002 <\/td>\n<\/tr>\n
36<\/td>\n9780784484463.003 <\/td>\n<\/tr>\n
47<\/td>\n9780784484463.004 <\/td>\n<\/tr>\n
67<\/td>\n9780784484463.005 <\/td>\n<\/tr>\n
82<\/td>\n9780784484463.006 <\/td>\n<\/tr>\n
89<\/td>\n9780784484463.007 <\/td>\n<\/tr>\n
106<\/td>\n9780784484463.008 <\/td>\n<\/tr>\n
115<\/td>\n9780784484463.009 <\/td>\n<\/tr>\n
128<\/td>\n9780784484463.010 <\/td>\n<\/tr>\n
141<\/td>\n9780784484463.011 <\/td>\n<\/tr>\n
156<\/td>\n9780784484463.012 <\/td>\n<\/tr>\n
171<\/td>\n9780784484463.013 <\/td>\n<\/tr>\n
182<\/td>\n9780784484463.014 <\/td>\n<\/tr>\n
196<\/td>\n9780784484463.015 <\/td>\n<\/tr>\n
208<\/td>\n9780784484463.016 <\/td>\n<\/tr>\n
219<\/td>\n9780784484463.017 <\/td>\n<\/tr>\n
235<\/td>\n9780784484463.018 <\/td>\n<\/tr>\n
247<\/td>\n9780784484463.019 <\/td>\n<\/tr>\n
256<\/td>\n9780784484463.020 <\/td>\n<\/tr>\n
271<\/td>\n9780784484463.021 <\/td>\n<\/tr>\n
282<\/td>\n9780784484463.022 <\/td>\n<\/tr>\n
291<\/td>\n9780784484463.023 <\/td>\n<\/tr>\n
303<\/td>\n9780784484463.024 <\/td>\n<\/tr>\n
314<\/td>\n9780784484463.025 <\/td>\n<\/tr>\n
322<\/td>\n9780784484463.026 <\/td>\n<\/tr>\n
333<\/td>\n9780784484463.027 <\/td>\n<\/tr>\n
339<\/td>\n9780784484463.028 <\/td>\n<\/tr>\n
349<\/td>\n9780784484463.029 <\/td>\n<\/tr>\n
360<\/td>\n9780784484463.030 <\/td>\n<\/tr>\n
370<\/td>\n9780784484463.031 <\/td>\n<\/tr>\n
378<\/td>\n9780784484463.032 <\/td>\n<\/tr>\n
405<\/td>\n9780784484463.033 <\/td>\n<\/tr>\n
416<\/td>\n9780784484463.034 <\/td>\n<\/tr>\n
426<\/td>\n9780784484463.035 <\/td>\n<\/tr>\n
437<\/td>\n9780784484463.036 <\/td>\n<\/tr>\n
448<\/td>\n9780784484463.037 <\/td>\n<\/tr>\n
478<\/td>\n9780784484463.038 <\/td>\n<\/tr>\n
486<\/td>\n9780784484463.039 <\/td>\n<\/tr>\n
496<\/td>\n9780784484463.040 <\/td>\n<\/tr>\n
506<\/td>\n9780784484463.041 <\/td>\n<\/tr>\n
520<\/td>\n9780784484463.042 <\/td>\n<\/tr>\n
536<\/td>\n9780784484463.043 <\/td>\n<\/tr>\n
548<\/td>\n9780784484463.044 <\/td>\n<\/tr>\n
560<\/td>\n9780784484463.045 <\/td>\n<\/tr>\n
579<\/td>\n9780784484463.046 <\/td>\n<\/tr>\n
587<\/td>\n9780784484463.047 <\/td>\n<\/tr>\n
608<\/td>\n9780784484463.048 <\/td>\n<\/tr>\n
621<\/td>\n9780784484463.049 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Electrical Transmission and Substation Structures 2022: Innovating for Critical Global Infrastructure<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASCE<\/b><\/a><\/td>\n2022<\/td>\n638<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":415292,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2660],"product_tag":[],"class_list":{"0":"post-415283","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asce","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/415283","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/415292"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=415283"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=415283"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=415283"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}